Singleton Bypass - Safe, Efficient Lifting with RUD

Posted 12/11/2025
Engineered Products

The Singleton Bypass is a $700 million project jointly managed by the Commonwealth and the NSW State Government. The New England Highway carries approximately 26,000 vehicles daily, including over 3,700 heavy vehicles. The bypass will alleviate traffic congestion by circumventing five sets of traffic lights in Singleton's CBD. When finished, it is expected to improve travel times, freight efficiency and safety for local and interstate motorists.

RUD Solutions

RUD supplied Philipp Cast-in Lifting Hoops for the bridge girders, which are a safe and efficient solution for lifting heavy prestressed units such as beams, decks, and girders. The cast in lifting hoops have a fully engineered design and are Working Load Limit (WLL) colour-coded for easy visual checks. They eliminate the need for specialist lifting clutches or equipment, making them simple to use and a more efficient method for large precast elements.

RUD has a team of design engineers to tailor lift designs to specific projects, with a focus on simple installation and safe and efficient final installation, including consideration for temporary works.

RESULTING BENEFITS

Lifting Hoops

  • Safer to use
  • Can be inspected easily (no cover/sheath compared to strand lifters)
  • Easy to install
  • No heavy and awkward lifting clutches required
  • Minimal lead time
  • Easy to handle

Testimonial

"When you are casting 100T concrete girders, there is little margin for error, and big savings can be generated if cost-effective solutions are provided. The benefit of engaging RUD was reflected in the fact that all girders were installed on time and without incident. I could call RUD anytime and they were at my disposal if there were onsite changes or questions.

Getting RUD involved early in the design phase assisted in the optimisation of walkways and produced savings on consumables. RUD are very pragmatic in their recommendations and utilise their extensive experience to problem-solve issues ahead of time.

As a business, we could not have been more impressed with Matt and the team. The advantage RUD provides is a solution-focused engineering team with a quick turnaround time".

Will Howson
Project Manager
Australian Precast Solutions

Do you want more information on infrastructure solutions? Call us on 07 3809 1300 or email us.

Article copyright to RUD Australia. Pictures are used from Transport for NSW. This information is accurate at the time of publication, and RUD Australia takes no responsibility for any errors, inadvertent or otherwise.

What Our Clients Say About RUD Australia

At RUD, we are all about our clients. Our collaborative approach makes us a partner of choice for organisations that value quality. 

Read why our clients trust us to deliver excellence in chain technology and engineered services.

Looking for a smart, chain driven solution?

Our in-house engineers and product experts will work with you to design a system that improves safety, reliability and productivity.
© 2026 RUD Group | All rights reserved
Solutions
Industries
Contact Us